Once you have completed this online form it will be automatically emailed to the Schedulingteam@central-networks.co.uk.

Once MPAN numbers have been raised we will confirm these to the email address or fax number stated along with the estimated w/c date for the works to be completed.

Before completing you call off please ensure your request meets the following criteria

  • Meter boxes are securely fitted to each property at the position shown on our design
  • The roof is on and the plot is watertight
  • Please ensure all scaffolding is taken down before the week commencing date
  • You have used correct PVC ducting and is exposed at both ends
  • The service pipes has been laid in accordance with our design and the mains live
  • Minimum 3 plots to be called off  
  • All necessary legal permissions have been completed
Your details * Mandatory field








Requested week commencing date for works to be completed * 


Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 





Plots to be connected * Mandatory field
Service required - Three Phase 