Jump to content

Energy Services

Industrial and commercial

Industrial and Commercial

To complete your application you will need the following information:

  • Maximum power required per unit in KVA (after diversity)
    An 80 amp 1 phase supply can provide up to 18KVA.
    A 100 amp 3 phase supply can provide up to 70KVA.
    CT metering can provide a maximum loading of 275KVA at low voltage.
    A supply in excess of 276KVA will need to be provided by a high voltage solution.
    To help us give you a more accurate quotation, it is better to indicate the actual capacity you require for each supply. This depends on your proposed usage - your electrician/ electrical contractor can provide you with this information.  
  • Disturbing loads
    Most enquiries are 'non-disturbing'. If the application if for a site with motors eg for swimming pools, air conditioning plant, lifts, ground source heat pumps or electric welding equipment, the load may be 'disturbing' and further information will need to be provided - we will not be able to proceed with the design without it. Information is required about all motors and electric welders to be connected to the system, especially for the largest Star Delta start motor and the largest direct on line (DOL) motor. If this information is unknown, please refer to the manufacturer or the equipment installer. If available, please provide copies of the data sheets for any motor that will be installed.
  • Electrical generation
    Please indicate if there will be any on site electricity generation.
  • Plans
    These can be uploaded as PDF, TIFF, Word Doc, DWG, DXF, ZIP or RAR.

Back to top