Jump to content

E.ON UK

Rhyd-y-Groes

Rhyd-y-Groes

Site Statistics

Rhyd-y-Groes

Location Anglesey, North Wales
Project scope 24 turbines
Turbine height 31m to hub, 46m to tip
Total power Up to 7.2MW

Commissioned in November 1992 the wind turbines are sited on agricultural land approximately 50 metres above sea level. The wind farm was developed by TriGen Windpower Limited and constructed by Toyo West (UK) Limited and is now owned by TPG Wind Limited, a joint venture between E.ON UK Renewables and Eurus Energy Europe BV.

The wind farm can generate enough energy to meet the average domestic needs of 4000 households and displaces the emission of 8136 tonnes of carbon dioxide annually.


Back to top