Downloads
A number of consents and licences are required to construct and operate of a wind farm development at Afton.
When we submitted our planning application in October 2004 this was accompanied by a non technical summary. In March 2009 we submitted further information in the form of an addendum, a peat stability report, to the Afton wind farm development Environmental Statement. Copies of the non technical summary and peat stability report can be found below.
| Description | File Type | Download File |
|---|---|---|
|
Peat Slide Risk Assessment Report Part A November 2008 |
439KB | |
|
Figures 1-4 November 2008 |
2.4MB | |
|
Figures 4-7 November 2008 |
3.0MB | |
|
Appendices A-D November 2008 |
182KB | |
|
Non Technical Summary October 2004 |
3.8MB |
